Filter

CATEGORY

COLOR

SIZE

PRICE

WOOL-SILK BLOUSON IN IVORY
  • 19,900
ADD TO WISHLIST
SIZE GUIDE & MEASUREMENTS
SHIPPING & RETURNS

Boxy-shaped blouson crafted in a wool-and-silk blend. It fastens with a double zip puller and has our signature ‘A’ in the pleat detail at the back.

70%CO,30%SE
Made in Italy

-Dry clean only, do not wash
-Iron on low heat
-Do not bleach
-Do not tumble dry