Boxy-shaped blouson crafted in a wool-and-silk blend. It fastens with a double zip puller and has our signature ‘A’ in the pleat detail at the back.
70%WV,30%SE
Made in Italy
-Dry clean only, do not wash
-Iron on low heat 
-Do not bleach
-Do not tumble dry
Boxy-shaped blouson crafted in a wool-and-silk blend. It fastens with a double zip puller and has our signature ‘A’ in the pleat detail at the back.
70%WV,30%SE
Made in Italy
-Dry clean only, do not wash
-Iron on low heat 
-Do not bleach
-Do not tumble dry