Filter

CATEGORY

COLOR

SIZE

PRICE

LEATHER BLOUSON IN RED
  • 36,500
ADD TO WISHLIST
SIZE GUIDE & MEASUREMENTS
SHIPPING & RETURNS

Boxy-shaped leather blouson with a shirt collar and a double zip fastening with our signature ‘A’ puller.

100% LEATHER
Made in Italy

-Dry clean only, do not wash
-Iron on low heat
-Do not bleach
-Do not tumble dry